Invitation to bid
The Town of Springerville Public Works Department maintains the public water, wastewater, transportation and facilities infrastructure.Location- 285 North Papago Street, Springerville, AZ, 85938 Hours of Operation Monday through Thursday 6:30am-5:00pm
Town of Springerville Public Works consists of nine (9) full time employees dedicated to providing preventative maintenance, hookups, and water/sewer installations. Most of the employees are certified in multiple areas such as water distribution, wastewater collection, wastewater treatment.
1 - Public Works Director1 - Foreman- Water & Waste Water Operator- Manages the Waste Water Treatment Plant1 - Administrative Assistant1 - Fleet Mechanic1 - Building Maintenance1 - Parks & Recreation (12 total Town Parks)3 - Employees- Roads, Waste Water (sewer), Water.
Contact Information:
Public Works Director, Robert Pena
Email Address- [email protected]
Phone Number- (928) 333-2656
Foreman, Fred Otero
Email Address – [email protected]
Phone Number – (928) 333-2656
Administrative Assistant, Samantha Dillon
To report road hazards or road issues please contact our Public Works Office at (928) 333-5016Click for Town of Springerville Snow Management Plan
The Division of Public Works maintains 23 miles of roadway, traffic and pedestrian services, street signs, street sweeping, guardrails, storm drainage, and bridges. These areas are to be kept as close to their original condition as possible.
The Road Maintenance crews provide cleanup, patching, and grading of unimproved roads, as well as snow removal on public thoroughfares. The Town maintains a heavy construction crew with a grader, loader, backhoe, dumptrucks, and power curber that the department uses to maintain and construct new roads.
During strong winter months, the crews will work around the clock to clear snow along major thoroughfares and school bus routes, whenever possible before the streets become active with traffic.
#1- In 2021 Sheldon Ave/ Hualapai/ Merrill full replacement.
#2- In 2024 North Pima full reconstruction using STP Funds.
#3- In 2025 Possible Signalized Intersection at Coconino / Airport Rd./ South Mountain using HSIP Funds.
#4- In 2026 Tumbling T full reconstruction using STP Funds.
#5- In 2029 Tori Circle full reconstruction.
Current Projects to Bid
Automate Meter Reading Equipment Procurement 222130.7022
Please contact Robert Pena (928) 333-5016 to receive a complete RFB bid packet.